Jun 25, 2022
The operating rules of the internal mixerTurn on the power in turn. If you need to heat, please set the temperature and observe whether the heating is normal.
-
Jun 20, 2022
The development direction of internal mixerThe internal mixer is referred to as "mixer", and the full name is called "closed rubber mixer", which is developed on the basis of open mixer.
-
Jun 15, 2022
Preparations before the dry running test of the internal mixerThe dry running test of the internal mixer must be carried out after the foundation is completely dry.
-
Jun 10, 2022
Parameter setting of calenderThe principle of formulating the design parameters of the calender is to achieve a calendering process to produce a qualified magnetic plate as much as possible.
-
Jun 05, 2022
Design and manufacture of calenderThe key to the design of the two-roll open calender is the roll structure, material selection, roll surface treatment and technical parameter determination
-
May 30, 2022
Technical background of calenderDomestic bonded ferrite magnet manufacturers all use calenders with bearing bush structure. The bearing pad material is generally copper or nylon
-
May 25, 2022
Preparation work before opening the millBefore opening the mill, you must check whether the circuit (current and voltage, etc.), oil circuit (reducer, bearing, etc. lubrication)
-
May 20, 2022
Precautions for open millThe purpose of standardized equipment operation and equipment maintenance is to ensure the normal operation of the equipment and prolong its life
-
May 15, 2022
Troubleshooting of open millThe open mill is subjected to vibration shock and other compound forces during production and operation, and failures such as bearing chamber wear often occur.
-
May 10, 2022
What is a calenderThe calender is composed of two or more rollers, arranged according to the heating method, which can be divided into cold pressing and hot pressing.